Here Is Exactly
How the Rebuild Works
Six phases, from the first walk of your lot to the day you get the keys back. No stage-managed optimism, no timeline we cannot defend; just the sequence, who reviews what, and where the real delays come from.
The Rebuild Process
Losing the House
Was the Easy Part
Everyone rebuilding right now is being told the same three things: it will take longer than you think, your insurance will not cover everything, and the permits are the hard part. All three are broadly true and none of them tell you what to do on Monday.
So here is the version nobody publishes. A rebuild has six phases. Each one has a specific agency, a specific document and a specific way it goes wrong. The owners who finish on schedule are not luckier; they got the insurance scope aligned before construction started and submitted a complete plan set the first time.
Zuma manages all six phases with its own crews, and we will tell you honestly at the site walk if your project is one we are not the right builder for.
Six Phases
From Burned Lot
to Certificate of Occupancy
- 01
Lot assessment and debris status
Before anything else we need to know what the site can support. Debris and ash removal status, soil condition after the burn, whether the foundation is salvageable (usually it is not), utilities, access, setbacks and what is left of the septic or sewer connection. This is a site walk, not a sales call; you get an honest read on where your lot stands.
- 02
Insurance scope alignment
This is the step that decides whether your rebuild finishes. A settlement written off a rough estimate rarely covers rebuilding to current code, because code upgrades, debris removal and fire-hardening requirements did not exist on the house you lost. We build a real construction budget in a format you can put in front of your carrier, and we align scope before construction starts rather than discovering the gap in month six.
- 03
Design and the like-for-like decision
Most jurisdictions offer a faster path for rebuilds that stay close to the original footprint, size and location, and a slower one for anything meaningfully larger. In the coastal zone that distinction can be the difference between a statutory exemption and a full coastal development permit. We map both options against your lot and your budget before an architect locks a design around the wrong assumption.
- 04
Permitting and plan check
We assemble the submittal, coordinate the architect and engineers, and route it to the right reviewer, which in the Palisades means the City's dedicated rebuilding center, in Malibu means city planning under the Local Coastal Program, and in the county areas means fuel modification review alongside building plan check. Most rebuild delay is resubmittal, not review. A complete package the first time is the whole game.
- 05
Fire-hardened construction
Rebuilds in mapped fire hazard severity zones are built to Chapter 7A of the California Building Code. That is not a finish upgrade; it changes the roof assembly, the vents, the eaves, the exterior wall cladding, the decking, the windows and the doors. We build to it as a matter of course, because every city we work in is substantially inside a mapped zone.
- 06
Final inspection and defensible space
Fire-zone projects are signed off against defensible space as well as construction. The approved fuel modification plan (the zoned landscape buffer around the structure) has to be in place at final. Planning for it during construction rather than scrambling at the end is what keeps a certificate of occupancy on schedule.
Fire Hardening
What Chapter 7A
Actually Requires
Chapter 7A of the California Building Code sets ignition-resistant construction standards for structures in designated fire hazard severity zones. Every city we build in is substantially inside one. These are the assemblies it governs, and the reason a rebuild costs more per square foot than the house that stood there before.
- Class A roof assembly
- The roof has to carry a Class A fire rating as a tested assembly under ASTM E108 or UL 790, with the underlayment and edge detailing the listing requires. Non-combustible gutters or gutter covers go with it.
- Ember-resistant vents
- Attic and crawlspace vents must be tested to ASTM E2886 for ember intrusion, flame exposure and heat transmission. Ember entry through ordinary venting is one of the most common ways a house is lost while the fire front is still blocks away.
- Rated walls, eaves and soffits
- Exterior wall cladding, eaves and soffits need ignition-resistant materials or tested assemblies. Open eaves are where wind-driven embers collect, so the detailing matters as much as the material.
- Glazing, decking and doors
- Windows generally require tempered glass, exterior doors need a fire-resistant rating, and decking within the required distance of the structure has to meet ignition-resistant standards.
By Jurisdiction
The Rules Change
City by City
A rebuild in the Palisades, a rebuild in Malibu and a rebuild in Calabasas are three different administrative projects. Each page below lays out who reviews your plans there and what triggers a second approval cycle.
Pacific Palisades
Los Angeles Department of Building and Safety (LADBS)
Rebuilding in the Palisades runs on a different permit track than the rest of Los Angeles. Here is how that track actually works.
Malibu
City of Malibu Building Safety and Planning
Malibu is its own city with its own Local Coastal Program. The approval path here looks nothing like the rest of Los Angeles County.
Calabasas
City of Calabasas Building and Safety
Calabasas runs its own plan check, protects its native oaks by ordinance, and hides a second layer of review inside its gated communities.
Hidden Hills
City of Hidden Hills Building and Safety
In Hidden Hills the City will not issue a building permit until the Community Association has approved your exterior design. That single rule governs the whole schedule.
Woodland Hills
Los Angeles Department of Building and Safety (LADBS)
Our own yard is here. Woodland Hills splits cleanly into flat-lot work and hillside work, and the two follow different rules.
Westlake Village
City of Westlake Village Building and Safety
Westlake Village straddles a county line, and which side your lot sits on changes who reviews the plans.
Straight Answers
Rebuild Questions
- Will my insurance settlement actually cover the rebuild?
- Often not on its own, and the gap is usually code upgrades. You are rebuilding to current standards (Chapter 7A fire hardening, current energy code, current structural requirements) on a house that was built to none of them. Whether your policy carries code upgrade coverage, and how much, is one of the first things to establish. We build the budget in a form your carrier can evaluate and align the scope before construction starts.
- How long does a fire rebuild take?
- It depends on the jurisdiction, the lot and how clean the plan submittal is, and we would rather give you a real number at the site walk than a marketing number here. What we commit to: a written schedule before we start and a weekly written update against it while we build.
- Can I rebuild bigger than what I lost?
- Usually yes, but it can move you off the streamlined rebuild track and onto the standard one, and in the coastal zone it can trigger a full coastal development permit. That is a real trade between size and schedule, and it is worth pricing both ways before the design is locked.
- Do I need a new soils report?
- Frequently, yes. Fire and the heavy equipment used for debris removal both affect the site, and most jurisdictions want current geotechnical information before approving a foundation. It is better handled early than as a correction during plan check.
- Do you work directly with my architect and public adjuster?
- Yes. We coordinate architects, engineers and consultants on every project and are comfortable joining a team that is already in place. Our job is to make the construction reality and the paperwork agree with each other.
- Are you licensed to do this work?
- Zuma Construction Corporation holds CSLB license #1055448, Class B, General Building Contractor, bonded and insured, building since 2019. You can verify it directly on the CSLB website, and we link to the live record on every page.
Jurisdiction rules, filing deadlines and fee waiver programs change. Nothing on this page is legal advice; confirm current requirements with your city's building department, and talk to us about how they apply to your lot. See also our full build process and completed work.